array(6) { ["description"]=> string(1476) "Renovation and expansion of several buildings for a biopharmaceutical product development center and cGMP manufacturing suite. Torcon provided CM services for the lab project and was part of an integrated design/build team for the process component of the project.
Interiors of two buildings were demolished to structure and then completely renovated. The manufacturing facility is in the renovated portion of one structure. To create the required space, half of the roof was lifted 14 feet to create a second floor and to provide overhead clearance required in the warehouse.
The manufacturing suite comprises six distinct areas: production, packaging, warehouse, a QC lab, an office area, and mechanical rooms. Torcon’s staff managed the expediting and installation of all process and packaging equipment. New utility equipment included seven new air handlers and three refurbished air handlers, new cooling towers, chillers, boilers, air compressors, waste neutralization, switchgear, UPS, and standby generator.
The 15,000 sq. ft. development lab provides analytical/physical characterization and formulation labs, with dedicated glass wash, storage and support areas. All MEP systems in the lab were new and included an air compressor, chiller, USP/DI skids, fume hoods, glove box, glassware washers, and stability chambers.
Construction included epoxy paint and floors and pre-fabricated cleanroom walls and walkable ceiling system.
" ["details"]=> array(3) { ["location"]=> string(12) "Confidential" ["architect"]=> string(12) "Confidential" ["key_facts"]=> array(4) { [0]=> array(1) { ["text"]=> string(23) "Construction Management" } [1]=> array(1) { ["text"]=> string(33) "100,000 SF Manufacturing Facility" } [2]=> array(1) { ["text"]=> string(13) "15,000 SF Lab" } [3]=> array(1) { ["text"]=> string(13) "cGMP Facility" } } } ["featured_image"]=> int(683) ["full_width_images"]=> array(1) { [0]=> int(683) } ["left_column_images"]=> array(4) { [0]=> int(690) [1]=> int(688) [2]=> int(686) [3]=> int(684) } ["right_column_images"]=> array(3) { [0]=> int(689) [1]=> int(687) [2]=> int(685) } }
Scale-Up Facility
Renovation and expansion of several buildings for a biopharmaceutical product development center and cGMP manufacturing suite. Torcon provided CM services for the lab project and was part of an integrated design/build team for the process component of the project.
Interiors of two buildings were demolished to structure and then completely renovated. The manufacturing facility is in the renovated portion of one structure. To create the required space, half of the roof was lifted 14 feet to create a second floor and to provide overhead clearance required in the warehouse.
The manufacturing suite comprises six distinct areas: production, packaging, warehouse, a QC lab, an office area, and mechanical rooms. Torcon’s staff managed the expediting and installation of all process and packaging equipment. New utility equipment included seven new air handlers and three refurbished air handlers, new cooling towers, chillers, boilers, air compressors, waste neutralization, switchgear, UPS, and standby generator.
The 15,000 sq. ft. development lab provides analytical/physical characterization and formulation labs, with dedicated glass wash, storage and support areas. All MEP systems in the lab were new and included an air compressor, chiller, USP/DI skids, fume hoods, glove box, glassware washers, and stability chambers.
Construction included epoxy paint and floors and pre-fabricated cleanroom walls and walkable ceiling system.