700 car parking structure with three levels of parking and a roof slab for future installation of a PV array. Precast concrete structural system with exterior precast facade with thin brick panel infills, curtainwall at the stairs and elevators, and metal panel elements.  MEP includes dry sprinkle standpipes, a roof and floor drain system, lighting, and a vehicle occupancy system.

Torcon completed this project under an accelerated six month schedule to help address the client’s critical need for on-site parking. Precast fabrication began in April, at the same time as site preparation. Precast erection was completed over a two month period (July to September) and the first cars parked in the facility on November 2—one month ahead of the contract schedule.

" ["details"]=> array(3) { ["location"]=> string(17) "Lawrenceville, NJ" ["architect"]=> string(6) "Desman" ["key_facts"]=> array(2) { [0]=> array(1) { ["text"]=> string(12) "Design Build" } [1]=> array(1) { ["text"]=> string(8) "700-cars" } } } ["featured_image"]=> int(1060) ["full_width_images"]=> array(2) { [0]=> int(1060) [1]=> int(1059) } ["left_column_images"]=> bool(false) ["right_column_images"]=> bool(false) ["client"]=> string(20) "Bristol-Myers Squibb" ["short_description"]=> string(0) "" }
Bristol-Myers Squibb

East Parking Garage

700 car parking structure with three levels of parking and a roof slab for future installation of a PV array. Precast concrete structural system with exterior precast facade with thin brick panel infills, curtainwall at the stairs and elevators, and metal panel elements.  MEP includes dry sprinkle standpipes, a roof and floor drain system, lighting, and a vehicle occupancy system.

Torcon completed this project under an accelerated six month schedule to help address the client’s critical need for on-site parking. Precast fabrication began in April, at the same time as site preparation. Precast erection was completed over a two month period (July to September) and the first cars parked in the facility on November 2—one month ahead of the contract schedule.

Project Details

Client
Bristol-Myers Squibb
Location
Lawrenceville, NJ
Architect
Desman
Key Facts
Design Build
700-cars