array(8) {
["description"]=>
string(790) "Torcon was the construction manager for a 2,000 SF building addition with specialty foundations and rigging to house the ZAP-X® Gyroscopic Radiosurgery with Synaptive MRI on the 1st floor of the Hope Tower. ZAP-X is an advanced form of radiation therapy and noninvasive alternative to stereotactic radiosurgery; the combination with Synaptive MRI provides real-time imaging feedback at all stages of clinical intervention.
The project also included a 10,500 SF renovation to create a new 12-bed Bone Marrow Transplant Unit; renovation of 8,000 SF of administrative space to create a 18-bed Observation Unit; and an interior renovation to expand the existing MRI department to house a new 1.5T Siemens MRI, a new induction room, additional holding bays and equipment storage.
"
["details"]=>
array(3) {
["location"]=>
string(19) "Neptune, New Jersey"
["architect"]=>
string(77) "RSC Architects, E4H Architects, DI Group Architects, and Saphire and Albarran"
["key_facts"]=>
array(3) {
[0]=>
array(1) {
["text"]=>
string(23) "Construction Management"
}
[1]=>
array(1) {
["text"]=>
string(15) "20,500 sq. ft. "
}
[2]=>
array(1) {
["text"]=>
string(24) "Renovations and Addition"
}
}
}
["featured_image"]=>
int(2666)
["full_width_images"]=>
array(2) {
[0]=>
int(2643)
[1]=>
int(2660)
}
["left_column_images"]=>
array(2) {
[0]=>
int(2645)
[1]=>
int(2656)
}
["right_column_images"]=>
array(4) {
[0]=>
int(2644)
[1]=>
int(2658)
[2]=>
int(2659)
[3]=>
int(2657)
}
["client"]=>
string(38) "Jersey Shore University Medical Center"
["short_description"]=>
string(139) "Torcon was the construction manager for over 17,000 SF of renovations and additions at Jersey Shore University Medical Center's Hope Tower."
}
Hope Tower Renovations and Addition
Torcon was the construction manager for a 2,000 SF building addition with specialty foundations and rigging to house the ZAP-X® Gyroscopic Radiosurgery with Synaptive MRI on the 1st floor of the Hope Tower. ZAP-X is an advanced form of radiation therapy and noninvasive alternative to stereotactic radiosurgery; the combination with Synaptive MRI provides real-time imaging feedback at all stages of clinical intervention.
The project also included a 10,500 SF renovation to create a new 12-bed Bone Marrow Transplant Unit; renovation of 8,000 SF of administrative space to create a 18-bed Observation Unit; and an interior renovation to expand the existing MRI department to house a new 1.5T Siemens MRI, a new induction room, additional holding bays and equipment storage.
Project Details