array(8) { ["description"]=> string(791) "Torcon was the construction manager for a 2,000 SF building addition with specialty foundations and rigging to house the ZAP-X® Gyroscopic Radiosurgery with Synaptive MRI on the 1st floor of the Hope Tower. ZAP-X is an advanced form of radiation therapy and noninvasive alternative to stereotactic radiosurgery; the combination with Synaptive MRI provides real-time imaging feedback at all stages of clinical intervention.
The project also included a 10,500 SF renovation to create a new 12-bed Bone Marrow Transplant Unit; renovation of 8,000 SF of administrative space to create a 18-bed Observation Unit; and an interior renovation to expand the existing MRI department to house a new 1.5T Siemens MRI, a new induction room, additional holding bays and equipment storage.
" ["details"]=> array(3) { ["location"]=> string(19) "Neptune, New Jersey" ["architect"]=> string(77) "RSC Architects, E4H Architects, DI Group Architects, and Saphire and Albarran" ["key_facts"]=> array(3) { [0]=> array(1) { ["text"]=> string(23) "Construction Management" } [1]=> array(1) { ["text"]=> string(15) "20,500 sq. ft. " } [2]=> array(1) { ["text"]=> string(24) "Renovations and Addition" } } } ["featured_image"]=> int(2666) ["full_width_images"]=> array(2) { [0]=> int(2643) [1]=> int(2660) } ["left_column_images"]=> array(2) { [0]=> int(2645) [1]=> int(2656) } ["right_column_images"]=> array(4) { [0]=> int(2644) [1]=> int(2658) [2]=> int(2659) [3]=> int(2657) } ["client"]=> string(38) "Jersey Shore University Medical Center" ["short_description"]=> string(139) "Torcon was the construction manager for over 17,000 SF of renovations and additions at Jersey Shore University Medical Center's Hope Tower." }
Hope Tower Renovations and Addition
Torcon was the construction manager for a 2,000 SF building addition with specialty foundations and rigging to house the ZAP-X® Gyroscopic Radiosurgery with Synaptive MRI on the 1st floor of the Hope Tower. ZAP-X is an advanced form of radiation therapy and noninvasive alternative to stereotactic radiosurgery; the combination with Synaptive MRI provides real-time imaging feedback at all stages of clinical intervention.
The project also included a 10,500 SF renovation to create a new 12-bed Bone Marrow Transplant Unit; renovation of 8,000 SF of administrative space to create a 18-bed Observation Unit; and an interior renovation to expand the existing MRI department to house a new 1.5T Siemens MRI, a new induction room, additional holding bays and equipment storage.