string(784) "700 car parking structure with three levels of parking and a roof slab for future installation of a PV array. Precast concrete structural system with exterior precast facade with thin brick panel infills, curtainwall at the stairs and elevators, and metal panel elements. MEP includes dry sprinkle standpipes, a roof and floor drain system, lighting, and a vehicle occupancy system.
Torcon completed this project under an accelerated six month schedule to help address the client’s critical need for on-site parking. Precast fabrication began in April, at the same time as site preparation. Precast erection was completed over a two month period (July to September) and the first cars parked in the facility on November 2—one month ahead of the contract schedule.
"
["details"]=>
array(3) {
["location"]=>
string(17) "Lawrenceville, NJ"
["architect"]=>
string(6) "Desman"
["key_facts"]=>
array(2) {
[0]=>
array(1) {
["text"]=>
string(12) "Design Build"
}
[1]=>
array(1) {
["text"]=>
string(8) "700-cars"
}
}
}
["featured_image"]=>
int(1060)
["full_width_images"]=>
array(2) {
[0]=>
int(1060)
[1]=>
int(1059)
}
["left_column_images"]=>
bool(false)
["right_column_images"]=>
bool(false)
["client"]=>
string(20) "Bristol-Myers Squibb"
["short_description"]=>
string(0) ""
}
East Parking Garage
700 car parking structure with three levels of parking and a roof slab for future installation of a PV array. Precast concrete structural system with exterior precast facade with thin brick panel infills, curtainwall at the stairs and elevators, and metal panel elements. MEP includes dry sprinkle standpipes, a roof and floor drain system, lighting, and a vehicle occupancy system.
Torcon completed this project under an accelerated six month schedule to help address the client’s critical need for on-site parking. Precast fabrication began in April, at the same time as site preparation. Precast erection was completed over a two month period (July to September) and the first cars parked in the facility on November 2—one month ahead of the contract schedule.