Projects

Seton Hall University

nj construction companies
  • Project Overview
  • Project Details

LOCATION:
South Orange, New Jersey

COMPLETED:
July 2014

PROJECT SERVICES:
Construction Management

Torcon wast the Construction Manager for the expansion of an on-campus parking deck. A five-story addition was completed over an existing tennis court, providing much-needed student parking space for 600 cars.

The new precast structure is connected to the existing parking facility at all levels and uses the existing facility’s entry/exit system and circulation ramps. The project was challenged by its logistics, including a very tight sight, limited roadway access, and the presence of vulnerable underground utilities. Torcon phased the critical garage connections to occur during the summer to minimize the loss of parking spaces. Construction was completed on schedule and in time for the start of the fall semester.